
The distribution system operations team is charged with maintaining safe, clean, drinking water, throughout the system. Currently, the system consists of 655.2 miles (3,459,656.21 ft.) of water main, 8 water pumping stations, and 17 water storage tanks (with 9,950,000 gallons of storage). The system serves approximately 19,000 customers in Dickson and Williamson Counties.